Waldorf Production Logo Gray

Columbus Field

The Columbus development is located in the Central North Sea 14km south of the Arran development and lies in a Paleocene reservoir.

The field was discovered in 2006 and is being developed as a subsea tieback via the new Arran development pipeline to Shearwater.  Gas will be exported from Shearwater through the SEGAL gas line and oil via the Forties Pipeline System (FPS).  First production is planned in 2021.

The field lies at a depth of 9,800ft and contains gas condensate with an initial yield of 40 bbls/MMscf.  The initial development will consist of a single production well.

Columbus
AssetLicenseBlockEquityFluidStatus
ColumbusP.131423/16f
23/21a
25.00%Gas
Condensate
Development
Columbus